The Raumer Full Time is a 10mm impact expansion bolt. It is intended for use in hand drilling and speleology. This bolt is NOT recommended for the standard protection of climbing routes.
This impact expansion bolt requires a 10mm drilling hole with a depth of approx. 4cm. It is equipped with a small bolt hanger for 1 lanyard. It is inserted into the finished drilling hole and must be fixed by hammering in the expansion pin.
Features Raumer Full Time
- Manufacturer: Raumer
- Material: AISi 316L stainless steel
- Weight: 70 gram
- breaking load: 22kN
- Diameter 10mm
- Shank length: 37mm
- Classic “impact expansion bolt”
- Fixed tab – cannot fall off
- Ideal for individual “emergency” securing points
- Ideal for hand drilling
- Ideal for individual belay points on alpine routes
- Not suitable for standardized climbing area equipment







